Devolvement of Grant
Required Documents
- Request Letter.
- Original, copy of Grant.
- Certified copy of history sheet of grant.
- Death Certificate or affidavit to that effect.
- If the spouse is the life interest, a photocopy of the marriage certificate.
- If the spouse does not take over, an affidavit expressing the intention to transfer the relevant land to a blood relative (must be certified by a Justice of the Peace - if the subsequent inheritance is named.
- If the spouse is deceased, a death certificate or affidavit to that effect.
- Birth Certificate of the transferee.
- A photocopy of the transferee's National Identity Card.
- Affidavits to confirm the change in names, if any.
- Confirmation that the transferee is the eldest son.
- If the transferee is a younger brother, the consent of all his male brothers preceding him Statement.
- If the transferee is a daughter of the grantee, then their statements.
| Details of work | Time (days) |
| Receive relevant documents as per the application letter and the application form. Obtain Grama Niladhari records | |
| ↓ | |
| Receive field records (Janapatha Niladhari / Senior Field Officer belonging to the Grama Niladhari division) | 21 |
| ↓ | |
| Submit the devolvement form (03 pages) prepared for naming the original inheritance to the Divisional Secretary for signature. | 14 |
| ↓ | |
| Submit to the District Registrar's Office for transfer and registration of the inheritance of the grant deed. | 14 |
| ↓ | |
| Receive the grant deed from the District Registrar's Office after registration. | 21 |
| ↓ | |
| Issuance of the grant deed and obtaining signature on the document. | 7 |
| Total days of service | 78 |
Hint: Click below to download the application form NP-LDO 04 [PDF 113KB]
Transfer of Grant
Required Documents
- Applicant's request letter.
- Original and photocopy of grant letter.
- If the land is transferred to the heir, the divided survey plan
- Land history sheet
- If the spouse is taking life interest, a photocopy of the marriage certificate.
- If the spouse is not taking over, an affidavit expressing the intention to transfer the relevant land to a blood relative (must be certified by a Justice of the Peace - if the next of kin is named)
- In the case of transferring a part of the grant land, the survey map obtained by the registered surveyor.
- Land registry notes related to the land (within 06 months)
- Affidavits expressing the intention of the grantee's family
- Original copies of relevant birth certificates to confirm the relationship
- If the transferee belongs to the Gov class, the Grama Niladhari report of the division (income report)
- Grama Niladhari report for the transfer of the grant land
- If the entire land is transferred, affidavit indicating the existence of other lands Photocopies of land deeds
- Photocopies of the National Identity Cards of the transferee and transferor certified by the Grama Niladhari
| Details of work | Time (days) |
| Submission of the following records to the Divisional Secretary for approval and signature. | |
| ↓ | |
| Provide the letter of approval of the Divisional Secretary for the transfer of land to the grantor. | 14 |
| ↓ | |
| Submit the draft of the transfer deed sent by the Notary for the approval of the Divisional Secretary. | 30 |
| ↓ | |
| Send the transfer deed to the Notary for registration. | 14 |
| ↓ | |
| Make necessary amendments to the deed register. | 14 |
| Total days of service | 53 |
Hint: Click below to download the application Transfer of Rights [PDF 134KB]
Nomination of Grantee (Nomination of Grant)
Required Documents
- Request letter (along with Grama Niladhari report)
- Original copy of Grant
- Photocopy of Grant
- A certified copy of National Identity Card of Grantee
- Birth Certificate of Proposed Successor/s
- A certified copy of National Identity Card of Proposed Successor/s
- Affidavits to confirm if there is a change in names
- Nomination of new successor - 03 forms.
- Cancellation of previously nominated successor and nomination of new successor - 06 forms
| Details of Work | Time (Days) |
| Obtaining relevant documents as per the request letter and the application form. Obtaining Grama Niladhari reports. | |
| ↓ | |
| Obtaining the signature of the Grantee, Grama niladhari in Form LC 155. | 21 |
| ↓ | |
| Obtaining field reports (Janapatha Niladhari Senior Field Officer belonging to Grama Niladhari Division) Obtaining signature from Divisional Secretary. | 21 |
| ↓ | |
| Name the heir of the grant deed and forward it to the District Registrar's Office for registration. | 14 |
| ↓ | |
| Issuance of grant deed. | 21 |
| Total days of service | 78 |
Hint: Click below to download the application form. Nomination [PDF 86KB]
Transfer of Land on Long-Term Lease
Required documents
- Request letter.
- Photocopy of the National Identity Card.
- Relevant Project Proposal.
- Field inspection report.
- Sketch.
- Recommendation reports of Relevant Department.
- Form P.L.C. 01.
- 19th Appendix Report.
- Affidavit of payment of Lease.
- Affidavit as per Appendix 17.
- Approval of local government institutions.
- Approval of the Division land use Committee.
- Approval of the District Land use Committee.
- Form for submission of lease to the management of government lands.
| Details of Work | Time |
| Obtaining recommendations from the Divisional Secretary | |
| ↓ | |
| Obtaining recommendation reports from relevant departments and institutions. | 02 months |
| ↓ | |
| Obtaining approval from the Divisional Land Use Committee. | 02 months |
| ↓ | |
| Obtaining approval from the District Land Use Committee. | 02 months |
| ↓ | |
| Sending to the Provincial Land Commissioner. | 02 months |
| ↓ | |
| Sending the survey request after receiving long-term lease approval. | 02 months |
| ↓ | |
| Request for L” Diagrame. | 02 months |
| ↓ | |
| Obtaining valuation report. | 02 months |
| ↓ | |
| Handing over the land after collecting the Lease as per the schedule. | 01 week |
| Sending the certified documents that the Lease has been paid to the Provincial Land Commissioner. | 01 week |
| ↓ | |
| Referring a copy to the Land Commissioner. | 01 week |
| Total Service Time | 1 Year |
Hint: Click below to download the application form Long Term Lease PLC-1 [PDF 523KB], Long Term Lease Application FormLease Application Formර [PDF 365KB], Affidavit Statements Affidavit Statement-[PDF 602KB], Affidavits 17 -[PDF 602KB]
Land Transfer to Departments and Local Government Institutions
Required documents
- Request letter from an authorized officer.
- 13th Appendix.
- P.L.C./U.N.P. 03 Report.
- Division Land Use Committee Report.
- District Land Use Committee Report.
- Surveyor Plan.
- Divisional Secretary Recommendation.
- Get the approval.
| Details of Work | Time |
| Preparation of 03 copies of 13th Appendix | |
| ↓ | |
| Preparation of 03 copies of P.L.C./U.N.P. 03 Report | 01 month |
| ↓ | |
| Obtaining the Division Land Use Committee Report | 01 week |
| ↓ | |
| Obtaining the District Land Use Committee Report. | 02 months |
| ↓ | |
| Obtaining Survey Plan from the Surveyor Department. | 02 months |
| ↓ | |
| Received by the Approval from P.L.C. | 02 months |
| ↓ | |
| Send the copy to Land Commissioner General | 01 week |
| ↓ | |
| Handover to the Local Government | 01 week |
| Total Service Time | 1 Year |
Hint: Click below to download the application form Application forms for transfer to the Department [PDF 882KB], Application forms for transfer to the Provincial Government Application forms for transfer to the Department [PDF 882KB]
Preparation of Pooja Grant
Required Documents
- Request Letter.
- Certificate that it is being maintained as a Buddhist temple.
- Certificate from the Department of the Commissioner General of Buddhist Affairs that it is registered as a temple.
- Certificate that the current Incumbent There was appointed when the Incumbent There changed.
- TL details
- Request for a surveyor plan from the Surveyor using B.A.A.118
| Details of Work | Time |
| Receive the request letter and obtain relevant Temple | |
| ↓ | |
| P.LC./U.N.P. Preparation of 03 copies of the report | 01 week |
| ↓ | |
| Obtain the report of the Division Land Use Committee | 01 month |
| ↓ | |
| Obtain the report of the District Land Use Committee. | 02 months |
| ↓ | |
| Obtaining Surveyor Plan from the surveyor department | 02 months |
| ↓ | |
| Submitting to the Land Commissioner | 02 months |
| ↓ | |
| Handing over to the Viharadhipathi Thero and reporting to the Land Commissioner | 01 week |
| Total Service Time | 01 year |
Preparation of Grant
Required Documents
- Request Letter
- Permit
- Ledger
- Survey Diagram & Telemen List
- Certified copy of NIC
| Details of Work | Time |
| Updating of Permit and Ledger. | Weeks 01 - 03 |
| ↓ | |
| Obtaining Land Field Inspection Report | Weeks 02 - 03 |
| ↓ | |
| Prepare necessary documents & Submit for DS Signature | Weeks 02 - 03 |
| ↓ | |
| Enter the whole data through “eslims” system and send to PLC, NP with DS recommendation | Weeks 01 - 02 |
| ↓ | |
| Receive the new grant and Hand over to the Grant holder. | Months 04 - 08 |
Tip: Click below to download the application Preparation of Grant Form [PDF 441KB]
Preparation of Permit
Required Documents
- Application Form (NP LDO 03)
- Certified copy of NIC
| Details of Work | Time |
| Obtaining Land Field Inspection Report | Weeks 01 - 03 |
| ↓ | |
| Prepare the necessary documents for Land Kachcheri and submit the DS | Weeks 01 - 02 |
| ↓ | |
| Enter the whole data through the “eslims” system and send to PLC, NP with DS recommendation | Weeks 01 - 02 |
| ↓ | |
| Conducting Land Kachcheri | Weeks 02 - 03 |
| ↓ | |
| Prepare the Permit and Handover to Permit holder | Months 03 - 04 |
Hint: Click below to download the application form Preparation of Permit [PDF 455KB]
Amendment of conditions in Grant
Required documents
- Application letter from grantee with G.N. report
- Certified copy of NIC
- Original copy of the Grant and Plan
- History Sheet
| Details of Work | Time |
| Obtaining land field inspection report | Weeks 01 - 03 |
| ↓ | |
| Prepare the “A” / “B” form and submit for the DS | Days 01 – 02 |
| ↓ | |
| Send to Land Registry | Days 01 යි |
| ↓ | |
| Hand over to grantee | Weeks 02 - 03 |
Hint: Click below to download the application form Amendment of conditions of grant papers "A" [PDF 173KB] , Amendment of conditions of grant papers "B" [PDF 234KB]
Grant Correction
Required documents
- Grantee's application letter with G.N. report
- Certified copy of the NIC
- Original copy of the grant
- History sheet
- Plan
| Details of Work | Time |
| Obtaining the land field inspection report | Weeks 01 - 03 |
| ↓ | |
| Prepare the necessary documents for the correction of grant and submit for DS | Days 04 - 06 |
| ↓ | |
| Send necessary documents to LC through PLC | Months 03 - 05 |
| ↓ | |
| Hand over to the Grant holder | Weeks 02 - 03 |
Hint: Click below to download the application form Correction of errors in grant forms Form 2 [PDF 268KB] , Correction of errors in grant forms Form 3 [PDF 164KB], Correction of errors in grant forms Form 4 [PDF 142KB], Correction of errors in grant forms Form 5 [PDF 475KB]
Illegal Encroachments
Required Documents
- Illegal Encroachment Reports through G.A.60
- Survey Reports
- Field Inspector Reports
| Details of Work | Time |
| Obtaining Illegal Encroachment Reports through G.A.60 from Grama Niladhari every two weeks | 02 weeks |
| ↓ | |
| Issuing Letters to Illegal Encroachers | 02 days |
| ↓ | |
| Obtaining Declarations of Abandonment | 01 month |
| ↓ | |
| Sending Notice of Occupancy | 02 weeks |
| ↓ | |
| Display of Notice of Occupancy | 01 month |
| ↓ | |
| G.N. on Returning or Not Returning Illegal Lands Obtaining the report +7 hours | 02 weeks |
| ↓ | |
| Request for eviction as per Form “B” of the Government Lands (Restoration of Possession) Act No. 07 of 1579 | 01 month |
| ↓ | |
| Processing for post-court proceedings | 01 week |
Cultivation meetings
Required documents
- Request letters from the farmer organization
| Details of Work |
Time |
| Reserving the date through the Pres. Secretary | 02 days |
| ↓ | |
| Notification of date, time and venue | 02 days |
| ↓ | |
| Conducting cultivating meetings on the scheduled date | 01 day |
| ↓ | |
| Sending reports to relevant parties | 01 week |
Timber cutting and transport
Timber cutting for household use
Required documents
- Request letter
- Photocopy of deed/permit
- Letter of consent from the owner if not the owner of the deed/permit
| Details of work | Time |
| Receipt of completed application by Grama Niladhari | 1 day |
| ↓ | |
| Obtaining field inspection report | 02 weeks |
| ↓ | |
| Submission to Divisional Secretary for approval |
1 day |
| ↓ | |
| Issuance timber cutting order | 1 day |
Hint: Click below to download the application Timber cutting application for household use [PDF 241KB]
Timber Transport Activities
Required Documents
- Request Letter
- Photocopy of Deed/Permit
- Letter of consent from the owner if not the owner of the Deed/Permit
| Details of work | Time |
| Received completed application | 1 day |
| ↓ | |
| Submit to the Divisional Secretary for approval | 1 day |
| ↓ | |
| Obtain Grama Niladhari reports |
02 weeks |
| ↓ | |
| Submit to the Divisional Secretary for approval | 1 day |
| ↓ | |
| Obtain field inspection report | 02 weeks |
| ↓ | |
| Submit to the Divisional Secretary for approval | 1 day |
| ↓ | |
| Obtain site recommendations | 01 month |
| ↓ | |
| Submit to the Divisional Secretary for approval | 1 day |
| ↓ | |
| Issuance of demolition orders | 2 days |
| ↓ | |
| Obtaining logs from the officer | 01 week |
| ↓ | |
| Submitting for approval to the Divisional Secretary | 1 day |
| ↓ | |
| Obtaining site officer reports | 02 weeks |
| ↓ | |
| Submitting for approval to the Divisional Secretary | 1 day |
| ↓ | |
| Issuance of permits | 1 day |
Hint: Click below to download the application form Timber Application for Transportation [PDF 639KB]
Land Affairs General
| Details of work | Time |
| Receive letters from the public | |
| ↓ | |
| Receive Grama Niladhari reports Time | 02 weeks |
| ↓ | |
| Receive Field Officer reports Time |
02 weeks |
| ↓ | |
| Prepare reply letters based on the above reports and submit them to the Divisional Secretary for approval | 01 day |
| ↓ | |
| Issuance of letters | 01 day |
Nomination of successor in the Permit
Required documents
- Request letter (with Grama Niladhari report)
- Original copy of the Permit
- Photocopy of the Permit national identity card (certified by the Grama Niladhari)
- Original copy of the proposed successor's birth certificate
- Photocopy of the proposed successor's national identity card (certified by the Grama Niladhari)
- Affidavit confirming the change in names if any
| Details of work | Time |
| Obtaining the request letter with the Grama Niladhari report | |
| ↓ | |
| Obtaining the land field inspection report | 02 weeks |
| ↓ | |
| Submit to Divisional Secretary’s approval | 01 day |
| ↓ | |
| Nominating the proposed nominee and submit for DS signature | 02 days |
| ↓ | |
| Issuance of the permit to the permit holder. |
Hint: Click below to download the application form Application for Succession [PDF 255KB], For Mud Land [PDF 263KB]
Permit Devolvement
Required documents
- Request letter (with Grama Niladhari report) Annexure - NP/LDO-04
- Original copy of the permit / Police report if the original copy is lost.
- Original copy of the permit holder’s death certificate or affidavit to that effect.
- Original copy of the marriage certificate if the spouse is taking life interest.
- Affidavit expressing consent to transfer the relevant land to a blood relative if the spouse does not take over (to be certified by a Justice of the Peace).
- Death certificate or affidavit to that effect if the spouse is deceased.
- Birth certificate of the transferee.
- Photocopy of the transferee's National Identity Card (certified by the Grama Niladhari)
- Affidavits confirming the change in names, if any.
- If the transferee is a younger brother or sister, affidavit of consent from all his/her previous siblings (to be certified by a Justice of the Peace).
| Details of work |
Time |
| Obtaining the request letter along with the Grama Niladhari report | |
| ↓ | |
| Obtaining the land field inspection report. | 02 weeks |
| ↓ | |
| Obtaining the approval of the Divisional Secretary | 01 day |
| ↓ | |
| Obtaining the approval of the Provincial Land Commissioner | 04 months |
| ↓ | |
| Obtaining the approval of the Divisional Secretary again | 01 day |
| ↓ | |
| Handing over to the applicant |
Hint: Click below to download the application form Original Permit Devolvement Application Form [PDF 253KB], If it is a mud land [PDF 263KB]
Permit Cancellation
| Details of work | Time |
| Obtaining the Field Inspection Report | 02 weeks |
| ↓ | |
| Obtaining the Grama Niladhari Report | 02 weeks |
| ↓ | |
| Obtaining the Divisional Secretary's Approval | 01 day |
| ↓ | |
| Displaying the cancellation notices as per Section 106 (2) (1) | 03 months |
| ↓ | |
| Conducting the license cancellation inspection | 01 week |
| ↓ | |
| Issuing the permit cancellation order | 01 week |
| ↓ | |
| Displaying the permit cancellation order | 01 month |
| ↓ | |
| Cancelling the permit | 01 week |
Obtaining copies of licenses (while the owner is alive)
Required documents
- Request letter
- Grama Niladhari report
- Police report
- Certified copy of NIC
- Original copy of the Permit holder’s birth certificate
- Affidavit confirming the change in names, if any
| Details of work |
Time |
| Receive the request letter with the Grama Niladhari report | |
| ↓ | |
| Obtain the land field inspection report | 02 weeks |
| ↓ | |
| Obtain the approval of the Provincial Land Commissioner | 04 months |
| ↓ | |
| Obtain the approval of the Divisional Secretary again | 02 weeks |
| ↓ | |
| Hand over to the applicant |
Hint: Click below to download the application form Application for obtaining copies of licenses [PDF 178KB], Affidavit [PDF 178KB] If it is a muddy land [PDF 263KB]
Land Disputes
| Details of work | Time |
| Receiving land dispute letters from the public | |
| ↓ | |
| Receiving Grama Niladhari reports Time | 02 weeks |
| ↓ | |
| Receiving Field Officer reports | 02 weeks |
| ↓ | |
| Calling the parties related to the problem to provide solutions according to the problem (through the Field Officer / through the Presiding Officer / through the District Secretary / through the Samatha Board / through the Court) |
- Obtaining the Ownership of Lands
[PDF - 0.98 MB] - Distribution of Lands
[PDF - 0.0 KB] - Changing the Ownership of Lands
[PDF - 0.0 KB] - Naming/Changing the Successor
[PDF - 2215 KB] - Transferring Deeds to a new Successor
[PDF - 0.0 KB] - Annual Rentals
[PDF - 0 KB] - Harvest Rentals
[PDF - 0.0 KB] - Long-term Rentals
[PDF - 551 KB] - Allocation of Lands for Religious Places
[PDF - 0.0 KB]















